Category
FULL ELECTRIC
WASTE TO ENERGY
Type
Waste electrical energy
Fuel
RSU and hospital – 6,1 t/h – 53.000 t/a
Boiler data
24,7 t/h, 50 bar, 390°C (SH)
Furnace Thermal Power
20,3 MWth
Electric Power
3,6 MWe
Scope
Grate furnace , integrated water tube boiler