Category
District Heating
WASTE TO ENERGY
Type
Cogeneration from waste
Fuel
MSW and hospital – 5.75 t/h – 49.700 t/yr each line
Boiler data
22,5 t/h cadauna (2 linee), 25 bar, 370°C (SH)
Furnace Thermal Power
21,6 MWth
Elettric Power
8,25 MWe
Thermal Output to Process
21 MWth to district heating
Scope
Steam Turboset, condensation system, thermal cycle, civil works